Sunday, 04 Oct 2026 Breaking: "I'm very proud of players' effort, it's a great experience": Skipper Gurpreet Singh Sandhu after friendly match against Brazil
BREAKING: Apple launches AI platform | Tesla earnings beat estimates | Nvidia stock surges | Bitcoin crosses major resistance
Business

Cabinet clears Rs 1.86 lakh crore Green Energy Corridor-III to evacuate 135 GW renewable power

Cabinet clears Rs 1.86 lakh crore Green Energy Corridor-III to evacuate 135 GW renewable power

New Delhi [India], September 30 (ANI): The Union Cabinet on Wednesday approved the Rs 1.86 lakh crore Green Energy Corridor Phase-III scheme to build transmission infrastructure for evacuation of up to 135 GW of renewable power and deploy 50 GWh of battery storage, as India prepares its grid for a sharp expansion in non-fossil energy capacity.
Union Minister Ashwini Vaishnaw, announcing the decision after the Cabinet meeting, said adequate transmission capacity would be critical as renewable generation rises, with the government seeking to ensure that grid infrastructure comes up ahead of new renewable projects.
A presentation made during the briefing said that without adequate transmission infrastructure, renewable power could face curtailment, and stressed that transmission capacity needed to precede renewable-energy capacity addition.
The scheme, targeted for completion by FY 2032-33, has a total project outlay of Rs 1,86,405 crore.
Of this, Rs 1,36,378 crore will go towards strengthening intra-state transmission systems, while Rs 50,000 crore has been earmarked for deployment of 50 GWh of Battery Energy Storage Systems.
The Centre will provide financial assistance of Rs 54,082 crore.
The scale of the scheme reflects the growing challenge of integrating larger volumes of solar and wind power into the grid. Unlike conventional generation, renewable output varies with sunlight and wind conditions, requiring stronger transmission networks as well as storage to balance supply and demand.
The battery systems can be installed at renewable-energy generation sites or other locations considered important for grid flexibility. According to the Cabinet release, they are intended to address intermittency, transmission congestion, peak-hour curtailment and demand during non-solar hours.
The government said the corridor will enable evacuation of up to 135 GW of renewable power across states and Union Territories.
Vaishnaw's presentation said India is targeting 500 GW of non-fossil fuel capacity by 2030 and is planning for around 786 GW by 2035-36. The Cabinet release separately said the scheme would contribute towards the longer-term target of 900 GW of installed non-fossil capacity by 2035.
India's rapidly expanding solar capacity is already increasing the need for supporting grid infrastructure. According to an official PIB backgrounder, India's installed solar capacity had reached 162.15 GW by June 30, 2026, up from around 3 GW in 2014. :chatgpt-content-reference{index="0"}
Under GEC-III, all new or greenfield intra-state transmission projects will be awarded through tariff-based competitive bidding.
Transmission service providers selected through the bidding process will build, own, operate and maintain the assets, while State Transmission Utilities will act as the overall implementing agencies.
Upgradation and strengthening of existing, or brownfield, transmission networks will be carried out on a cost-plus basis.
The government said the central assistance would help offset intra-state transmission charges and limit their impact on electricity costs for consumers.
The scheme also marks a significant expansion of India's Green Energy Corridor programme, which was originally designed to strengthen transmission networks in states with high renewable-energy potential.
With renewable generation expanding faster, the focus is increasingly shifting from merely creating generation capacity to ensuring that electricity can be transmitted, stored and supplied when it is needed. (ANI)

Tags

Related News

RBI repo rate may climb to 6 pc in FY27; G-Sec yields face upward pressure: Report
Business
RBI repo rate may climb to 6 pc in FY27; G-Sec yields face upward pressure: Report

<p>New Delhi [India], October 4 (ANI): The Reserve Bank of India (RBI) is expected to raise the repo rate by 25 basis po...

Pricing pressure, geopolitical risks to weigh on India IT growth in Q2FY27: Report
Business
Pricing pressure, geopolitical risks to weigh on India IT growth in Q2FY27: Report

<p>New Delhi [India], October 4 (ANI): India’s IT sector is expected to post another quarter of muted growth amid pricin...

Adani Airports set to begin Mumbai Terminal 1B redevelopment in Jan 2027
Business
Adani Airports set to begin Mumbai Terminal 1B redevelopment in Jan 2027

<p>New Delhi [India], October 3 (ANI): Adani Airports-operated Mumbai International Airport Limited (MIAL) will begin ph...

West Asia conflict has ‘massive’ economic and geopolitical impact, says UBC Economist Amartya Lahiri
Business
West Asia conflict has ‘massive’ economic and geopolitical impact, says UBC Economist Amartya Lahiri

<p>New Delhi [India], October 3 (ANI): The ongoing conflict in West Asia is having significant economic and geopolitical...

US natural gas production hits record high in July 2026: EIA
Business
US natural gas production hits record high in July 2026: EIA

<p>New Delhi [India], October 3 (ANI): US natural gas production reached an all-time high in July 2026, driven primarily...

Apple removes Bitchat from app store in India; Twitter co-founder Jack Dorsey reacts
Business
Apple removes Bitchat from app store in India; Twitter co-founder Jack Dorsey reacts

<p>New Delhi [India], October 3 (ANI): Apple has removed Bitchat, the offline messaging application associated with Twit...